Scope Overview:

The proposed project will require the establishment of mining operations at South Flank and construction of associated infrastructure with processing capacity up to 80 million tonnes per annum  including:

  • Primary crushing facilities nominally located to the north of the proposed deposits;
  • Run of Mine pads;
  • Overland conveyors to Mining Area C;
  • Coarse Ore Stockpile and Ore Handling Plant infrastructure at Mining Area C;
  • Upgrade to the existing stockyards and outflow facilities;
  • Duplication of the existing rail loop and addition of a second Train Loadout;
  • Advanced mine de-watering in accordance with the mine plan;
  • Expansion of the existing Mulla Mulla Accommodation Village;
  • Installation of supporting non-process infrastructure (e.g. power lines, access roads) to support the new mining areas; and
  • Expansion of existing non-processing infrastructure and industrial facilities to support production.